Ongoing projects

Administrative and hotel building in Riga

The main purpose of the construction project, according to the design assignment, is to adapt the existing unfinished building’s reinforced concrete frame structure to the construction of an office building, which provides the function of a service hotel.

The building consists of 1 part-ground floor/basement and 3 – upper floors.

In the basement there are auxiliary rooms and technical rooms, archives, laundry rooms, meeting rooms, office rooms, kitchen rooms for the restaurant, dressing rooms for employees, gym rooms, recreation, and entertainment rooms (home cinema, game room), rest rooms, training rooms, sanitary units for both visitors and employees.

The layout of the 1st floor includes workspaces (open-plan offices), meeting rooms, sanitary units for both visitors and employees, utility rooms, restaurant rooms with terrace, staff kitchen, reception, service hotel rooms, lobby.

The main entrance to the building is provided at the level of the 1st floor, organized in the main facade (facing north).

On the 2nd and 3th floors, it is planned to have office and meeting rooms for the company’s employees.

In accordance with the design task issued by the customer,  a total of 110 parking spaces are planned to be provided in the territory, including 6 for persons with disabilities and 12 pcs. charging points for electric cars. 12 pieces cable infrastructure is provided for parking lots, a total of all the electrical cables needed for 24 parking spaces infrastructure. Also, storage facilities for 38 bicycles have been designed. Charging stations for two electric scooters are provided in the bicycle storage facility.

 

read_more July 04,2025

Building for hotel and sports purposes

Dariaus ir Girėno St. 23, Vilnius

The existing administrative building and part of the existing industrial building are being reconstructed into a five-story hotel. The remaining western part of the industrial building will be converted into a sports facility. In addition, a newly designed and constructed one-story, rectangular sports building is planned.

The reconstructed sports facility will house a swimming pool and sauna area, while the newly constructed sports building will be dedicated to a tennis court.

On the ground floor of the hotel building, along the northern façade of Block A, commercial premises are planned with direct access from the outside. The rest of the ground floor of Block A will accommodate a reception area, a restaurant serving guests of the hotel, swimming pool, and tennis court, as well as other hotel service areas. Short-term accommodation rooms of various sizes will be located on the 2nd to 5th floors of Block A and the 1st to 4th floors of Block B.

  • Area of the reconstructed sports building: 1,543 m²
  • Area of the hotel building: 4,968 m²
  • Area of the commercial premises: 84.85 m²
  • Area of the newly constructed building: 3,521 m², of which the sports hall occupies 2,971 m²

 

read_more July 02,2025